Headquarters construction project Neusäß – October 2023

01.10. – 31.10.2023

The stairwell finally has its glass roof, vast quantities of pipes and cables are still being laid and the walls are being plastered

The glass panes for the glass roof above the stairwell fly in. They are not hanging by a thread, but by glass suction cups – but they hold.

You can’t yet see the glass roof in all its glory from the inside, as there is scaffolding underneath it.

Now the walls on the first floor are also being plastered.

And the fire doors are also being installed. They are still waiting to be installed on the first floor.

The doors have already been installed in the cellar.

More pipes and cables are still being laid on the floor on the 1st floor.

The future staff lounge, with its own roof terrace.

It’s always amazing that someone still has an overview of all the cables.

The stairwell is still waiting to be plastered. So far it has only been primed.