Headquarters construction project Neusäß – December 2023

01.12. – 22.12.2023

Final spurt before the winter break: the stairwell is plastered, the photovoltaic system is installed on the roof and work begins on laying the heating/cooling ceiling

The stairwell is temporarily impassable as scaffolding has been erected for plastering.

Work is still underway on laying the heating/cooling ceiling in the multifunctional area.

The heating/cooling ceiling in the entrance area is almost ready for the pipes to be laid in it.

Another view of the entrance area from the front door. This is where an exhibition of DICTATOR products will be located in the future.

The stairwell has been plastered – and you can use the stairs to get to the upper floors again.

The weather is kind in the last week before Christmas: the photovoltaic system can still be installed.

Photovoltaic systems are now installed on both roofs. This means that renewable energies play an important role at DICTATOR and contribute to improving the ecological balance.

View of the spacious entrance area. It is still obstructed by scaffolding. The space in front of the entrance will have a large glass roof so that nobody is left out in the rain.

A view of the annex from the neighboring property.I wonder what it will look like when the scaffolding is taken down after the winter break?