Headquarters construction project Neusäß – February 2023 | Part I

30.01.2023 – 03.02.2023

Construction work is underway again. The exterior walls in the warehouse area are being formed, as is the other side of the elliptical staircase.

The floor in the future storage area has been cleared of snow, the formwork on the ellipse of the staircase has been removed, and work has begun on the formwork on the other side.

At the end of the week, the formwork on the other side of the staircase is almost finished. In the front area of the building, the first floor as well as the floors above will get a glass façade, which invites to come in. In the front of the picture you can see the future entrance area, where our visitors will find a showroom with information about our products and their areas of application.

The back area of the ground floor will become the warehouse. Therefore, formwork for concreting the outer walls is also necessary there. The steel braiders are already almost finished, so that the inner sides of the formwork can soon be attached in the coming week.

10.02.2023

A first tour of the “building”

View from the outside of the future entrance. On the right in the picture our previous building, which will be completely renovated after completion of the extension.

View from outside into the training and conference area. No exterior walls will be concreted here; instead, there will only be concrete columns, between which glass walls will provide an open feel.

View from the outside of the stairwell ellipse – and the existing building.