Headquarters construction project Neusäß – April 2023 | Part I

27.03.2023 – 06.04.2023

Work on the 1st floor

Next, the columns that support the ceiling of the 1st floor are created.

And already, on the 1st floor, the wall of the staircase is on one side – and the other is boarded up.

06.04.2023

Walk-through of the construction site

In the area outside the interior base, a green rooftop area will be created. A beautiful view for everyone in the future sales office.

In the back area, the insulation is now almost completely laid.

Good and successful work also requires breaks. A large recreation and break room is being created here.

Where there is now space for lattice boxes and building materials, there will be a roof terrace directly in front of the recreation room.