Headquarters construction project Neusäß – March 2023

02.03.2023 – 24.03.2023

The ground floor gets the ceiling

The beams of the slab in the front area are formed.

Here you can already see the ellipse that determines the shape of the first and second floors.

The first of many layers of structural steel are laid.

The ceiling is ready concreted – and now you can already clearly see the ellipse shape.

The staircase as an ellipse within the ellipse. On the right you can already see the edge of the ellipse. Outside there will be a green roof area.

The construction site directly in front of the office window: the edges of the roof area are being concreted. Here, too, the structural steel clearly shows the contours of the second floor.