Headquarters construction project Neusäß – May 2023 | Part II

22.05.2022 – 02.06.2023

The second floor takes shape

Tour of the 2nd floor. Clearly recognizable: our stairwell ellipse.

Several offices will be created here, all with the best view.

Here, the new building “docks” with the existing building.

Above the stairwell ellipse nothing is boarded – because there the roof is glazed, so that always a lot of natural light enters the stairwell.

The boarding of the ceiling of the 2nd floor – almost looks like a work of art.

The photovoltaic system on our existing building. On the sunny, long days at the end of May 2023, we are self-sufficient in our power supply – and even supply electricity to the grid.