Headquarters construction project in Neusäß – August 2022
01.08.2022
Demolition work
This part of our front building had to be demolished to allow trucks to drive up for loading and unloading during the construction phase.
There was a lot of dust…
… and this is how it looked after that.
29.08.2022
Preparations
Next, our existing parking lot was bulldozed. Since then, parking has to be done on the other side of the building and behind the building in tight spots – the first to arrive will be the last to leave. 🙂