11.04.2023 – 21.04.2023

The first floor takes shape

Another tour is due: the entrance and exhibition area on the first floor – now already without supports.

On the other side on the first floor is the meeting and event room – still a bit of a damp squib for visitors 🙂

And already we are on the 1st floor. In the south facade of the old building, 2 windows have already disappeared behind a concrete wall. The later connecting doors are already clearly visible in the boarding.

And the construction work continues: on the 1st floor, the ceiling boarding is being installed.

Where one used to look out of the office window onto the courtyard, one now looks into the future sales office.

Where there is now space for lattice boxes and building materials, there will be a roof terrace directly in front of the recreation room.