Product details
Installation
Installation
The power packs may only be installed in dry rooms. When the surrounding temperature drops below 0 °C, it has to be made sure that no ice can form in the power packs. During service the power packs heat up. Therefore make sure that air can circulate through the lateral ventilation slots.
The casing is fixed via two holes ø 5.5 mm in its bottom. For the connection to the mains and the connected devices two screwed cable glands M12 and M16 are provided.
Order information
Order Information
Description | Part No. |
---|---|
Power pack 12 VDC, 5 A | 710781 |
Downloads
File Name | Type |
---|---|
Documents | |
Power Packs | |
STEP Drawings | |
STEP NT3 power pack, 710782_710784 | stp |